Photo tour of Lee Company in Essex
The Electro-Fluidic Systems Group was formed in 1984 to create a complete engineering and manufacturing cell within The Lee Company. Steady expansion led to a move into the Essex building in 1990. This facility of 135,000 sq. ft. is dedicated to EFS products and is equipped with the latest production equipment.




Valves begin as 3D CAD designs and are fabricated in clean, laboratory like production areas.


All phases of production are contained under one roof including machining, molding, assembly, coil winding, and testing.


Engineering prototypes and production tooling are made in a full service toolroom.


Engineers, Inspectors and Machinists work hand in hand to assure that your parts meet requirements.






For more information, please send us your application information via our ASK LEE service. Or contact our application engineers in the USA at 1-800-LEE-PLUG or our representatives around the world.
Copyright 09/2010 by The Lee Company, USA
-- Trademark information --
LEE Homepage